INCREASING THE AVAILABILITY OF ROLLING STOCK BY ACCELERATING THE PAINTING PROCESS
DOI:
https://doi.org/10.17605/OSF.IO/QH4SXKeywords:
availability factor,, overhaul, alternative workshopAbstract
Improving the availability of a locomotive by reducing the time spent on painting.







